Beltway Beat
Get Ready to Align Your Supplier Program with New FSMA Rules

FSMA’s preventive controls rule mandates a supply-chain program to “provide assurance that a hazard requiring a supply-chain-applied control has been significantly minimized or prevented.” The rule defines a supply-chain-applied control as “a preventive control for a hazard in a raw material or other ingredient when the hazard in the raw material or other ingredient is controlled before its receipt.”

FDA made a few general updates in the final rule, including changing “supplier program” to “supply-chain program”, and it designated a subpart G with eight sections of regulatory text. Intended to improve clarity and readability, the language reflects its applicability to non-suppliers in a new requirement – that is, a supply-chain control can be applied and/or verified by a non-supplier (e.g., distributor, broker, aggregator). However, the receiving facility must verify the supply-chain-applied control itself or obtain documentation of the verification activity, review and assess the documentation, and document that review and assessment.

There are different compliance dates for the supply-chain program versus the entire rule, aligning  compliance with the dates of FSVP rule and providing greater consistency. This also addresses comment concerns that a receiving facility would be required to comply with the supply-chain program provisions before its supplier must comply with applicable new FSMA food safety regulations.

Does your current program comply with the new rules? If not, how can you bring it in line?

The Supply Chain Program

The rule requires a supply chain program when the receiving facility has identified, through its hazard analysis, that there is a hazard requiring a supply-chain-applied control. The program should address hazards requiring a preventive control that may be intentionally introduced for purposes of economic gain, as well as those unintentionally introduced.

FDA specifies the basic content of a supply-chain program, but allows for some flexibility. The rule mandates that the supply-chain program include:

In supplier approval and determination of supplier verification activities, the receiving facility must consider:

Other key points of the rule:

About The Author

Exit mobile version